The pilot that never scaled
Pilots are designed to succeed at small scale. Most of them are also, accidentally, designed to fail at large scale.
A pilot succeeds when it is small. That is not a finding. It is a property of being small: fewer users, one site, a team that talks to each other, and a scope chosen because it could be finished.
Then it is declared a success, funded for rollout, and quietly stops working. The usual explanation is “change management”. The real explanation is that the pilot was never a smaller version of the rollout. It was a different thing that happened to share a name.
Four things that only exist at small scale
- Manual glue. Someone exports a file every morning and drops it somewhere. At one site this is a habit. At twenty it is an unowned dependency nobody has resourced.
- Proximity. The product lead sits with the users, so problems get solved in conversation before anyone writes them down. At scale the same problem becomes a ticket with a two-day turnaround.
- A forgiving definition of done. Pilots are allowed to have edges. Rollouts are judged on the edges.
- An exception path that runs through one person. One named manager approves the odd case. At scale that person becomes a bottleneck, and the queue becomes the reason people stop using the system.
None of these appear in the pilot report, because inside the pilot none of them were problems.
Design the pilot as a smaller rollout
The pilot should run the operating model the rollout will run, at reduced volume. That means a real support rota, a real exception path with a queue and a service level, and a real reporting line for defects. It means resisting the temptation to staff the pilot with your best people, because the rollout will not have them.
It also means measuring the things that get worse when you scale: time to resolve a ticket, proportion of cases needing a human, cost per transaction. A pilot that is cheaper per transaction at ten users than at a hundred is telling you something about the manual glue, not about the software.
The number to put in the business case
Not the pilot's benefit. The cost of the gap between the pilot's operating model and the target one. If that gap is unstaffed and unfunded, the rollout is not funded either — it is a pilot with a bigger invoice.
The teams that scale are boring about this. They build the support model before the second site, they resource the exception queue, and they let the first site keep its manual glue only with a named owner and a removal date.